Building Project

Building Project Update

Every time we look at the building works we can notice something new. Some of the works that have taken place in the last fortnight include:

  • New floor to ceiling windows at the front of the school in the STEM/Performing Arts room
  • Plastering and painting of indoor learning spaces
  • Laying of carpet and vinyl in the indoor learning spaces
  • Even more concrete being poured in the piazza area for seating and retaining walls
  • Fences beginning to be erected
  • Roofing and landscaping around old parish toilet
  • Outside lights on multipurpose sports courts
  • Structural work on the air-lock at the front of the school
  • Structural work under the Breeze Way for the installation of roller door
  • Structural work for the facade at the front of the school