Buildings and Grounds

Music Room at Coburg
We’re excited to report the new Music Studio at Coburg has been completed. The project includes:
- a dedicated Rehearsal Room
- a fully equipped Control Room to support our
music production program.
- an extended mezzanine area that will function as
a classroom and teaching space.
This development represents a major investment in our music program and will provide students with improved facilities for rehearsal, recording, collaboration, and music education. The space will be ready for use later in Term 3.
Outdoor Umbrella for Richmond Courtyard
Following requests from students, we have purchased an outdoor umbrella and installed it over the courtyard table at Richmond, providing a shaded outdoor area for students to sit and enjoy during breaks.
Netball Court Build at Richmond
We are very excited that construction is now underway on this long awaited project.
Extension of Green Room at Coburg
Alongside the plastering and painting repairs required in the reception area at Coburg, we have created a doorway connecting the Green Room to the adjoining office. This will allow the office to be utilised as an extension of the Green Room space, providing greater flexibility and capacity. As with the Music Room project, these works are scheduled to be completed during the school holidays.
Garden Maintenance & Tree Planting
We have been regularly engaging contractors to maintain and improve our native gardens at both Coburg and Richmond. This included a significant amount of local indigenous planting in the past couple of weeks, and plenty of mulch generated from the removal of (exotic) trees for the court build.






