Buildings and Grounds Upgrades

In the last edition of The Cheltonian, we reported that the installation of the shade sail structure on the grassed area to the north of B Wing had commenced with the holes being dug in preparation for the cement and poles.  Since then, the poles have been erected and this week, the shade sails were installed.

 

They look great!