We are on the trajectory of the completion of stage 3 of the Capital Works. The lift shaft has been installed and all concrete pours have been completed. The administration section of stage 3 is due to be handed to us after 12 November. This will see Student Services relocate. The final part of the stage 3 redevelopment will continue in 2022. This will mean for the beginning of 2022 music, drama and dance arrangements through this year will continue into the new school year.

South side – Admin Building Pavements
South side – First fix and pavement ready for condensers
Admin – New MDF Cupboard in prep for COMMS changeover
Admin – Flushing to Admin Areas – Prep for base coat
Admin/PAC – Atrium Lift Shaft and Stairwell walls
Admin/PAC – Spider crane erecting floor beams and first floor steel
PAC – Auditorium steel ready to be lifted into position
PAC – Back of house flushed ceiling and off-form ramp wall
PAC – Ramp stab. Sand filled in prep for formwork
South side – Admin Building Pavements
South side – First fix and pavement ready for condensers
Admin – New MDF Cupboard in prep for COMMS changeover
Admin – Flushing to Admin Areas – Prep for base coat
Admin/PAC – Atrium Lift Shaft and Stairwell walls
Admin/PAC – Spider crane erecting floor beams and first floor steel
PAC – Auditorium steel ready to be lifted into position
PAC – Back of house flushed ceiling and off-form ramp wall
PAC – Ramp stab. Sand filled in prep for formwork