We are on the trajectory of the completion of stage 3 of the Capital Works. The lift shaft has been installed and all concrete pours have been completed. The administration section of stage 3 is due to be handed to us after 12 November. This will see Student Services relocate. The final part of the stage 3 redevelopment will continue in 2022. This will mean for the beginning of 2022 music, drama and dance arrangements through this year will continue into the new school year.

Gallery Image
South side – Admin Building Pavements
Gallery Image
South side – First fix and pavement ready for condensers
Gallery Image
Admin – New MDF Cupboard in prep for COMMS changeover
Gallery Image
Admin – Flushing to Admin Areas – Prep for base coat
Gallery Image
Admin/PAC – Atrium Lift Shaft and Stairwell walls
Gallery Image
Admin/PAC – Spider crane erecting floor beams and first floor steel
Gallery Image
PAC – Auditorium steel ready to be lifted into position
Gallery Image
PAC – Back of house flushed ceiling and off-form ramp wall
Gallery Image
PAC – Ramp stab. Sand filled in prep for formwork
South side – Admin Building Pavements
South side – First fix and pavement ready for condensers
Admin – New MDF Cupboard in prep for COMMS changeover
Admin – Flushing to Admin Areas – Prep for base coat
Admin/PAC – Atrium Lift Shaft and Stairwell walls
Admin/PAC – Spider crane erecting floor beams and first floor steel
PAC – Auditorium steel ready to be lifted into position
PAC – Back of house flushed ceiling and off-form ramp wall
PAC – Ramp stab. Sand filled in prep for formwork