CAPITAL WORKS UPDATE

Progress of the stage 3 works includes extensive demolition, ground works and underpinning. Some internal work has commenced particularly in the Performing Arts Centre.

Modification works to form new openings in existing walls

Dance & Band rooms

Timber ramp framed & floor sheeted Collaborative space

Under pining works of external footing

Under pining works of external footing

Planter box strip footing (Inc. starter bars) pour on South side

Installation of new storm-water & connection into existing infrastructure


Demolition & removal of Bldg 4 suspended concrete floor slab

Status of ceilings & walls Blg 4 Collaborative space & Dance Room

Footing excavation commenced & ongoing Building 1 (Admin)

Modification works to form new openings in existing walls

Dance & Band rooms

Timber ramp framed & floor sheeted Collaborative space

Under pining works of external footing

Under pining works of external footing

Planter box strip footing (Inc. starter bars) pour on South side

Installation of new storm-water & connection into existing infrastructure


Demolition & removal of Bldg 4 suspended concrete floor slab

Status of ceilings & walls Blg 4 Collaborative space & Dance Room

Footing excavation commenced & ongoing Building 1 (Admin)